Worcester 24i Junior Manuel d'instructions Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
10
SYSTEM PRESSURE
6 720 802 048 (2013/05)
4SYSTEM PRESSURE
4.1 SEALED HEATING SYSTEMS
This boiler is fitted to a sealed heating system which is pre-pressurised. Your installer will advise you of the minimum and maximum
pressure indicated on the pressure gauge.
Check regularly that the pressure is maintained.
If the pressure gauge reads less than 1 bar then the system requires re-charging.
Contact your installer or maintenance engineer if a permanent significant decrease or increase in pressure is indicated on the
pressure gauge.
The filling method will be one of three types:
Optional “Keyless”integral filling link
Optional “Keyed” integral filling link
An external filling loop, fitted valves and flexible hose.
4.2 LOCATING THE INTEGRAL FILLING LINK
To remove bottom panel:
1. Push the panel back fully to release the front edge
2. Pull forward and down to remove
Fig. 7 Remove the bottom panel
Fig. 8 Integral filling link location
1.
6720806709-01.1Wo
2.
67206800521-02.2Wo
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 19 20

Commentaires sur ces manuels

Pas de commentaire