Worcester 30i System Compact Manuel de service Page 10

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 14
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 9
1918
Option 3
VERTICAL BALANCED FLUE SYSTEM WITH TWO
90° BENDS
Flue Components Required
30CDi Conventional
40CDi Conventional
Flue Diameter Description Quantity
Worcester Part No.
100mm Vertical Flue Kit 1 7 719 002 430
100mm Extension Flue Kit up to 7 7 719 002 349
100mm 90˚ Elbow 2 7 719 002 348
125mm Vertical Flue Kit 1 7 719 002 431
125mm Extension Flue Kit up to 16 7 719 001 892
125mm 90˚ Elbow 2 7 719 001 899
30CDi System
Flue Diameter Description Quantity
Worcester Part No.
100mm Vertical Flue Kit 1 7 719 002 430
100mm Extension Flue Kit up to 7 7 719 002 349
100mm 90˚ Elbow 2 7 719 002 348
125mm Vertical Flue Kit 1 7 719 002 431
125mm Extension Flue Kit up to 16 7 719 001 892
125mm 90˚ Elbow 2 7 719 001 899
Flue Diameter Description Quantity
Worcester Part No.
125mm Vertical Flue Kit 1 7 719 002 431
125mm Extension Flue Kit up to 13 7 719 001 892
125mm 90˚ Elbow 2 7 719 001 899
Maximum total straight flue length (inc. terminal)
100mm 125mm
30CDi Conventional 5,400mm 14,500mm
40CDi Conventional N/A 12,000mm
30CDi System 5,400mm 14,500mm
Installation requirements
Installation of the Greenstar CDi series must be in accordance with
the relevant requirements of the Gas Safety (Installation Use)
Regulations (as amended), current IEE Wiring Regulations, local
Building Regulations, Building Standards (Scotland) (Consolidation)
regulations and bylaws of the local Water company and Health and
Safety Document No. 635 (Electricity at Work Regulations 1989).
It should be in accordance with the relevant recommendations of the
following British Standards:
BS 6798; BS 5449; BS 5546:1; BS 5440:1; BS 5440:2;
BS 6891.
Gas Safety (Installation and Use) Regulations. All gas appliances
must be installed by a CORGI registered person in accordance with
the above regulations. Failure to install appliances correctly could
lead to prosecution.
The manufacturers notes must not be taken in any way as overriding
statutory regulations.
Sealed primary systems
The appliance is fitted with a manual reset high limit thermostat and
is suitable for use with a sealed primary system.
The system should be installed in compliance with the requirements
of BS 5449: Part1. The system must be fitted with a spring loaded
safety valve set to operate at 3bar (45 psi) and the pipe connections
made through the system must be capable of sustaining a pressure
of up to 3bar.
Manual air vents should be fitted at any high points in the system.
The following is a list of major items which must be fitted to the
system:
1. Safety valve – 3bar
2. Pressure gauge – 0 - 4bar
3. Expansion vessel
4. Automatic air vent
Typical fully pumped sealed system
System filling and make-up
To comply with the Water Authority requirements, the system
should be filled via a temporary hose connection to the mains cold
water supply, with a double check valve assembly and test point
fitted to the mains water side of a temporary circuit. Alternatively,
for the Greenstar CDi boilers, the plug in filling loop option (part
number 7 716 192 281, see page 22 for photograph), simply
connects between the cold main connection and the heating
return circuit on the wall mounting jig.
Valves and joints
It is very important that all valves and joints are able to sustain a
working pressure of up to 3bar (45psi). Particular care should be
exercised when fitting radiator valves and only those of high quality
to BS 2767:10 should be used. All other valves and fittings should
comply with BS 1010.
Loss of water pressure from a sealed system will require
continuous recharging with fresh water and consequential
introduction of air. Air is highly corrosive and will considerably
reduce life expectancy of radiators, pumps etc.
30CDi System diverter valve kit
The 30CDi System boiler can be adapted to house an in-built
diverting valve. The optional valve motor kit allows the user to
control the supply of heat to the hot water cylinder from the boiler.
Plastic pipe work
The use of plastic pipe work is acceptable. However, some plastics
are permeable to oxygen and must be avoided. Only pipe work with
a polymeric barrier should be used. Please note that the first
600mm of pipe work connected to the boiler must be of copper or
steel.
BBT181 Gstr CDi Conv T&S IssB 4/5/06 11:21 Page 18
Vue de la page 9
1 2 ... 5 6 7 8 9 10 11 12 13 14

Commentaires sur ces manuels

Pas de commentaire