Worcester Greenstar Ri Manuel de service Page 17

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 53
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 16
A - Straps
B - Outer carton
C - Base tray
D - Inner wrap and wall templat
e
E - Wall mounting plate
F - Installer pack
G - Base Panel
H - 22mm pipes (2) (system flow and return)
IMPORTANT HANDLING INSTRUCTIONS
It is advised that two people are used to carry
the carton from the van to the point of delivery.
• Once the carton has been delivered , the outer
carton is removed first. Care should be taken
when releasing the straps. If a sharp impliment
is used make sure the outer carton is not
peirced and that the impliment is used in such a
way so that it may not cause personal injury. All
sharp objects must be covered or the blade
retracted after use and put away in a safe
place. The wall mounting plate, the 2 X 22mm
pipes and the Lit/Hardware pack are now
removed making sure that no damage occurs to
the internal wrap which doubles as the Wall
Template. Care should be taken when lifting the
boiler from the base and the proper technique
for safe lifting of any heavy object should be
strictly observed.
Additional requirements for roof space
installation:
The boiler should be first unpacked before
ascending ladder to loft space.
• Two sets of steps should be used.
• Two people should share the lifting of the
boiler up to the loft hatch, where the boiler is
entered into the loft space tilted and slid on its
back into the loft.
Once the appliance is removed from its
packaging check the contents against the
packing list.
Before installing appliance ensure system has
been cleaned as explained on page 8.
UNPACKING THE BOILER
LIFTING AND CARRYING PRECAUTIONS:
• Lift only a manageable weight, or ask for
help.
When lifting or putting things down, bend
the knees, and keep the back straight
and feet apart.
Do not lift and twist at the same time.
Lift and carry objects close to the body
IIMPORTANT: All the previous Pre-Installation sections must be read
and requirements met before starting boiler or flue installation.
E
F
NOTE:
Cardboard
inner wrap is
also the wall
template.
NOTE: Carefully cut along perferated line to
release wall template.
A
B
C
D
C
D
G
H
UNPACKING THE BOILER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR Ri
8 716 109 699a (05/05)
16
INSTALLATION
Vue de la page 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 52 53

Commentaires sur ces manuels

Pas de commentaire