Worcester Greenstar Ri Manuel de service Page 42

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 53
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 41
REPLACEMENT OF PARTS
5. Moving boiler control to service
position
5.1 Remove two screws (A)securing control.
5.2 Hang control on two lugs (B) on boiler
framework.
6. Gas valve
Isolate gas supply at boiler gas cock.
6.1 Remove wire clip from gas valve outlet then
pull gas adjustment assembly free from
plastic connector and pull forward clear of
case.
6.2 Undo bottom gas connection to gas valve.
6.3 Undo two securing screws (C)on the
underside of casing.
Pull valve up and forward out of boiler.
Disconnect electrical connections.
Replace valve with new seals and check for
gas soundness.
7. Gas adjuster
Isolate gas supply at boiler gas cock and
repeat step 6.1 above.
Twist retaining clip (D) to release then
remove clip and tube.
Refit new adjuster and secure with clip.
Note: The valve will require setting, follow
procedure “Setting the gas/air ratio”.
8. Syphon
8.1 Undo plastic nut (E) on the syphon outlet.
Drop condensate tube away from syphon.
8.2 Remove two screws (F)retaining the bracket.
8.3 Rotate syphon 90° to the left and remove.
E
The following components require
the control to be moved in to the
service position and the bottom
tray removed:
Gas valve
Syphon
PCB fuse
Transformer
5.1 5.2
A
6.2
6.3
6.1
7
8.3
8.2
8.1
B
D
F
C
REPLACEMENT OF PARTS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR Ri
8 716 109 699a (05/05)
41
SERVICING
& SPARES
Vue de la page 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 52 53

Commentaires sur ces manuels

Pas de commentaire