Worcester Greenstar Ri Manuel d'instructions Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 56
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
1450mm
870mm
400mm
+ 30mm
above elbow
5mm
5mm
20mm
to removable door
200mm
600mm
front clearance
for service
This boiler is only suitable for installing internally
within a property at a suitable location onto a
fixed, rigid surface at least the same size as the
boiler and capable of supporting the boiler
weight.
COMPARTMENTS:
Follow the requirements of BS6798 and
BS5440 Part 2 and note:
Minimum clearances must be maintained
An access door is required to instal
l,
service
and maintain the boiler and any ancilliary
equipment
.
If fitting the boiler into an airing cupboard
use a non-combustible material (which can be
perforated with holes upto 13mm diameter) to
seperate the boiler from the airing space.
BOILER CLEARANCES:
The diagram opposite shows the minimum
space required to install and service the boiler.
If a boiler is installed in a compartment with
clearances less than shown in the tables oppo-
site, ventilation is required. Refer to tables
below for ventilation requirements.
BOILER CLEARANCES - UNVENTILATED
COMPARTMENTS:
The tables opposite show the options for the
minimum space required to install and service
the boiler inside an unventilated compartment.
*NOTE: These are the combined top & bottom
clearances excluding the appliance.
**NOTE: These are the combined left & right
clearances excluding the appliance.
BOILER LOCATION &
CLEARANCES
SERVICING CLEARANCES
VENTED COMPARTMENT
Using 100mm flue kit
980mm
Using 125mm flue kit
- 1010mm
VENTILATION FREE COMPARTMENTS
INSTALLATION CLEARANCES
Ventilation Free Compartment Installation Clearances
The suggested total unventilated compartment minimum clearances are:
Side Above Below Front (to removable door)
400mm 170mm approx. 200mm 100mm
(30mm above
the elbow)
(Note: Top and bottom clearances must not be reduced below these values as they are the
minimum required for servicing).
If Side Clearances are Reduced
350mm 441mm 129mm
300mm 523mm 161mm
250mm 617mm 200mm
200mm 727mm 243mm
150mm 856mm 295mm
100mm 1012mm 358mm
50mm 1202mm 434mm
If total side clearance is
reduced to:
Then overall height clearances
must be increased to (approx):
OR
Front clearance (to removable
door) must be increased to:
If Front Clearance is Reduced
50mm 511mm 505mm
25mm 596mm 569mm
If front clearance (to
removable door) is
reduced to:
Then overall height clearances
must be increased to (approx):
OR
Total side clearance must be
increased to:
** *
* **
BOILER LOCATION & CLEARANCES
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR Ri
8 716 115 168a (06/2008)
10
PRE -
INSTALLATION
Ri
Vent To room or Direct to
position internal space outside
High Minimum free Minimum
level area 122 cm
2
free area
61 cm
2
Low Minimum free Minimum
level area 122 cm
2
free area
61cm
2
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 55 56

Commentaires sur ces manuels

Pas de commentaire