Worcester Greenstar Ri Manuel d'instructions Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 56
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
PRE-COMMISSIONING
CHECKS
CAUTION: ISOLATE THE MAINS
SUPPLIES BEFORE STARTING ANY
WORK AND OBSERVE ALL
RELEVANT SAFETY PRECAUTIONS
1 Check that the service and water pipes are
connected to the correct position on the
manifold.
A - Flow (22mm)
B - Return (22mm)
C - Gas inlet (22mm)
2 Check the gas type specified on the
identification plate matches that of the gas
supply. Turn on the main gas supply, check
the gas pipework, connections and rectify
any leaks.
NOTE: Do not use solvents, adhesive or
lubricant when pushing the pipe
onto the rubber connector.
3 Check that the condensate pipe (D) has
been connected to the syphon.
IMPORTANT: If the boiler is not to be
commissioned immediately then:
after successfully completing all of the
checks and any rectification work,
close the gas and water valves, shut off
the gas supply and electrically isolate
the boiler.
A
B
C
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR Ri
8 716 115 168a (06/2008)
26
PRE-COMMISSIONING CHECKS
D
COMMISSIONING
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 55 56

Commentaires sur ces manuels

Pas de commentaire