Vue de la page 50
No light
Light on but
boiler not
operating during
demand
*Slow flash
(normally off,
flashes on)
*Slow flash
(normally on,
flashes off)
Fast flash
2 pulses
5 pulses
Ignition lockout
Flue overheat
Heat exchanger overheat
Flue pressure switch
Volatile lockout
(sensor, fan or code plug)
Permanent mains supply to boiler.
Boiler mains switch on.
Fuse F1.
Fuse F2.
Transformer (both coils below 100).
Otherwise replace control board (if boiler does not operate correctly).
Boiler demand live at ST2 terminal
LR (is there a demand)
By pass is open
If either only HW or CH is operating check diverter valve/frost stat/
room stat/programmer.
Otherwise replace control board.
Gas present and at correct pressure.
Combustion CO2 level.
Flue condition
Ignition electrodes/cables/connections
Flame sense electrode/cables/connections
Gas valve (coils 140-190).
Otherwise replace control board.
Flue temperature too high.
Heat exchanger baffles have been removed and not refitted.
Water pressure/dry
All air vented
Pump/cables/connections
Water leaks/blockages
Safety thermostats/cables/connections
Otherwise replace control board
Blockage in flue system
Temperature sensor (8000 - 20000).
Wiring/connections to sensor.
Fan/cable/connections.
Code plug fitted.
Service mode switch in min position.
Service mode switch in max position.
NOTE : This fault finding information is for guidance only. Worcester cannot be held responsible for costs incurred by persons not deemed
to be competent.
The electronic control system for this boiler incorporates a blue central indicator. This normally confirms the permanent mains supply but, by
flashing at different rates during a fault, provides a guide to the cause as listed.
This fault finding system assumes that the appliance has been operating normally until the time of failure (i.e. not a first installation error).
PRELIMINARY CHECKS : Preliminary electrical system checks are the first electrical checks to be carried out during a fault-finding
procedure. On completion of the Service/Fault-Finding task which has required the breaking and remaking of electrical connections, check
(a) EARTH CONTINUITY, (b) SHORT CIRCUIT CHECK, (c) POLARITY and (d) RESISTANCE TO EARTH.
FAULT FINDING
*Reset via the user control.
Indication
Fault
Possible solution/check
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR Ri
8 716 115 168a (06/2008)
49
FAULT FINDING
FAULT FINDING
& DIAGRAMS
Vue de la page 50